Miramonte Resort & Spa
Nizar Farhat, Jeff Allen PM
Location:
Indian Wells
CA
Size:
90,000+
Sq. Ft.
Completion:
2023
April
Cost:
$12
Million
0
Sq. Ft.
Cost:
$0
General contractor of site, lobby, restaurant, and room renovation projects. Complete infrastructure and remediation and finish of carpet, flooring, wallpaper, casework, electrical, mechanical, plumbing, and paint.
Palm Springs Surf Club
Client:
Colin O’Byrne
Location:
Palm Springs
CA
Size:
21
Acres
Completion:
2023
December
Cost:
$15.5
Million
0
Sq. Ft.
Cost:
$0
Statewide Services Inc., played a crucial role in developing a world-class destination, contributing significantly to the construction and enhancement of various features. Our meticulous construction of all the restaurants ensures that each dining experience meets the highest standards of quality and ambiance. Additionally, we revitalized the lazy river, constructed pools, and transformed common areas into inviting spaces for relaxation and recreation. A standout achievement is the construction of a 7500sf VIP two-story private lounge, exclusively accessible to members, boasting premium amenities like a plate-up kitchen and fully integrated meeting spaces. Our dedication to excellence has elevated the destination into a premier leisure and entertainment hub, offering guests an unparalleled experience of resort-style amenities, captivating waterpark attractions, and meticulously crafted dining options.
Fantasy Springs Resort Casino
Client:
Jim Schneider
Owner Rep
Location:
Indio
CA
Size:
133 ct. Rooms
Including 10 Suites
Completion:
2022
November
Cost:
$1.1
Million
0
Sq. Ft.
Cost:
$0
General Contractor, superintendent, Five (5) floors of room remodel including flooring, structural, mechanical, electric, plumbing, and upgrade of interior design models.
USC Keck School of Medicine
Client:
USC
Location:
Palm Desert
CA
Size:
2,400
Sq. Ft.
Completion:
2016
Cost:
$320,000
0
Sq. Ft.
Cost:
$0
Complete laboratory tenant improvement at the University of Southern California. Project included, but not limited to demolition of existing walls and offices, removing furniture, constructing new walls, drywall, mechanical and electrical, reconfiguration of fire sprinkler system, new casework, countertops, doors and hardware, installation of new tile and furniture, and patch and paint.
Skyline at Bliss & Oasis
Client:
Colin O’Byrne
Location:
Indio
CA
Size:
64
Units
Completion:
2026
Cost:
$25
Million
0
Sq. Ft.
Cost:
$0
Developer and general contractor for mixed-use apartment complex located o in the heart of the revitalized downtown district. The largest privately financed consturction in the city.
Agua Caliente Cultural Plaza
Client:
Agua Caliente Band of Cahuilla Indians
Location:
Rancho Mirage
CA
Size:
90,000+
Sq. Ft.
Completion:
2023
October
Cost:
$34
Million
0
Sq. Ft.
Cost:
$0
Statewide Services completed a comprehensive construction and finishing project for the Agua Caliente Cultural Plaza. This included the full development of the museum which features planters, walkways, water features, and decorative walls. The project also involved all decorative wall finishes, including paint and wallpaper, enhancing the aesthetic and functional aspects of the center.
Canyon Springs Villas
Client:
Colin O’Byrne
Location:
Cathedral City
CA
Size:
48
Units
Completion:
2026
Cost:
$38
Million
0
Sq. Ft.
Cost:
$0
Construction for an apartment complex located in up and coming area of Cathedral City, CA.
Agua Caliente Fuel Station
Client:
Agua Caliente Band of Cahuilla Indians
Location:
Rancho Mirage
CA
Size:
90,000+
Sq. Ft.
Completion:
2023
October
Cost:
$12.8
Million
0
Sq. Ft.
Cost:
$0
At Statewide Services Inc., we take pride in our ability to realize innovative projects, and our latest venture exemplifies this commitment. From inception to completion, we’ve constructed a dynamic destination that caters comprehensively to our customers’ needs. With features like a convenience market, Beer Cave, and drive-through Java Caliente, we’ve curated an unparalleled convenience experience. Additionally, we’ve successfully delivered a 750 square foot gaming area, accommodating 31 Class II gaming machines, providing customers with instant excitement. Moreover, the fuel station is equipped with 24 pumps dispensing various fuel types, ensuring customers can refuel both their vehicles and themselves conveniently. This project not only demonstrates our construction prowess but also establishes new benchmarks for convenience, entertainment, and overall customer satisfaction.
Agua Caliente Spa at Séc-He
Client:
Agua Caliente Band of Cahuilla Indians
Location:
Rancho Mirage
CA
Size:
90,000+
Sq. Ft.
Completion:
2023
October
Cost:
$34
Million
0
Sq. Ft.
Cost:
$0
Statewide Services completed a comprehensive construction and finishing project for the Agua Caliente Spa at Séc-He. This included the full development of spa finishes such as saunas, salt caves, and a zen garden. Site work for the spa was conducted, featuring planters, walkways, water features, and decorative walls. The project also involved all decorative wall finishes, including paint and wallpaper, enhancing the aesthetic and functional aspects of the spa.
Fantasy Springs Resort Casino / Rock Yard
Client:
Jim Schneider
Owner Rep
Location:
Indio
CA
Size:
5,000
Sq. Ft.
Completion:
2022
September
Cost:
$250,000
0
Sq. Ft.
Cost:
$0
General Contractor and management of 5000 SF design renovation of Fantasy Springs Resort Casino public venue “Rock Yard” stage. Project included structural steel installs, stadium lighting, custom hardscape paving, tiles, and landscaping.
Radisson / USC Hotel
Client:
USC
Deepal Jayasooriya, PM
Location:
Los Angeles
CA
Size:
12
Floors
Completion:
2021
May
Cost:
$3.2
Million
0
Sq. Ft.
Cost:
$0
Complete cosmetic conversion of Radisson Hotel to USC Hotel. The scope of work includes complete renovation of corridors and guest rooms. Removal and replacement of light fixtures and decorative fixtures along with carpet, base, and wallcoverings. All guest room aesthetic included: liquidation of FF&E, carpet/flooring R&R, restroom complete remodel, new tub, new tile, paint, installation of owner provided FF&E, and finish trim.
Desert Hematology
and Oncology
Client:
Green Towne Inc.
Location:
Rancho Mirage
CA
Size:
13,914
Sq. Ft.
Completion:
2020
May
Cost:
$1.25
Million
0
Sq. Ft.
Cost:
$0
Construction of a new one-story medical office building and tenant improvement for Desert Hematology and Oncology. Project included full site build-out and infrastructure utilities. In addition, new mechanical, electrical, plumbing work, framing, structural steel, stucco and drywall was completed. Paint and new landscaping is being done to close the job.
Okura
Client:
Jay Lee
Private Owner
Location:
La Quinta
CA
Size:
6,700
Sq. Ft.
Completion:
2019
December
Cost:
$1.2
Million
0
Sq. Ft.
Cost:
$0
General Contractor and management of 6700 SF design build of upscale sushi restaurant and bar. Complete renovation of plumbing, electrical, kitchen, cook line, refrigeration, flooring, and structural. Purchase and installation of finished stainless steel kitchen equipment. All points of entrance and bathrooms are ADA compliant. Additional scope of work was back patio oasis, fountain at front entrance, signage, VIP room, and custom décor, including RGB cycle lighting for signature Sokura cherry blossom tree.
The Vue Grille & Bar
Client:
City of Indian Wells
Location:
Indian Wells
CA
Size:
6,700
Sq. Ft.
Completion:
2019
September
Cost:
$1.2
Million
0
Sq. Ft.
Cost:
$0
General Contractor and Superintendent of 5,650 sq. ft. design build of the kitchen, cook line, refrigeration, flooring, structural, mechanical, electric, and plumbing. Installation of finished stainless steel kitchen, hot line, and refrigeration. Additional scope of work included roofing, ceiling remodel, banquet bar design and rebuild, solid surface, lighting, and custom steel finish. Complete dining room remodel, custom framework, digital electronics control integration system, and new structural glazing ingress and egress point.
Sage Initiative Dental
Client:
Dr. J
Location:
Indio
CA
Size:
3,650
Sq. Ft.
Completion:
2018
Cost:
$420,000
0
Sq. Ft.
Cost:
$0
Existing one-story commercial building at Shadow Hills Plaza Commercial Complex in Indio, CA. Tenant improvement was for a new dental office that consisted of a main lobby at entrance and reception area, (2) women’s and (2) men’s restrooms, (1) janitor room, (1) conference room, (1) break room/conference room, (3) general offices, (9) dental exam rooms.
Gentiva Health Services
Client:
Jay Lee
Private Owner
Location:
Palm Desert
CA
Size:
5,200
Sq. Ft.
Completion:
2014
Cost:
$550,000
0
Sq. Ft.
Cost:
$0
Existing one-story grey shell building tenant improvement in The Village at University Park. Project included, but not limited to underground water, metal stud framing, drywall, t-bar, insulation, installation of HVAC units, electrical outlets, low voltage re-wiring, installation of new flooring, glazing, doors and hardware, plumbing, and painting.
Miramonte / Tommy Bahama Hotel
Client:
Miramonte Resort & Spa
Nizar Farhat, Jeff Allen PM
Location:
Indian Wells
CA
Size:
90,000+
Sq. Ft.
Completion:
2023
April
Cost:
$12
Million
0
Sq. Ft.
Cost:
$0
General contractor of site, lobby, restaurant, and room renovation projects. Complete infrastructure and remediation and finish of carpet, flooring, wallpaper, casework, electrical, mechanical, plumbing, and paint.